Localized Higher Temperature in the Production areas.
Installed Breezair Units providing spot cooling along with extract fans.
Improved working condition with cool air directed to the work.
Vehicle Testing | Tyre Centres
The excessive temperature inside the kitchen due to air imbalance.
Air Cooling System was compared to conventional AC Systems for this project.
Horse Stables including the re circulation of toxic air.
Examples are galore where lack of fresh ambient air provisions.
Zoo Areas
G+1 Office extension project at Jebel Ali Industrial Area 3
G+1 Hotel Building
M/s AL Masaood Bergum Design & Build Project
Dr Juan AL Daheri
M/s Abdulla Jassim Contracting